Projects

Road-CERP Ghazni to Nawur Road, Ghazni

Client:
USACE
Co Number:
W5J9JE-10-C-0059
Awarded Year:
2010
Final Value:
US$10,527,557.00
Substantial completion Date
1 Jan 2012
Service Category
Infrastructure

Project Description

Omran was awarded the Design / Build of approximately 20 Km of asphalt-paved road in Ghazni Province. This project includes, but is not limited to, the survey, design, and construction of a roadway which includes a 7m-wide paved (120 mm asphalt) carriageway with 1.5m asphalt shoulders from Ghazni District (Start: 33.56612 N, 68.41169 E) to Seh Qaleh Village (End: 33.62087 N, 68.23108 E), Ghazni Province, Afghanistan. The distance along the route is estimated to be approximately 20 Km.

Project Gallery

Project Description

Omran was awarded the Design / Build of approximately 20 Km of asphalt-paved road in Ghazni Province. This project includes, but is not limited to, the survey, design, and construction of a roadway which includes a 7m-wide paved (120 mm asphalt) carriageway with 1.5m asphalt shoulders from Ghazni District (Start: 33.56612 N, 68.41169 E) to Seh Qaleh Village (End: 33.62087 N, 68.23108 E), Ghazni Province, Afghanistan. The distance along the route is estimated to be approximately 20 Km.