Project Description

KfW awarded OMRAN the contract to design and build Faizabad Water Supply and Distribution Network that included water supply system, water distribution mains, chambers, valves, joints, bends, air valves, wash outs, valves and hydrants, standpipes, house connection and other equipment and elements. The Water Supply Distribution system was implemented in NTLZ and NTHZ zones.
üNTLZ Network: Supply and laying of principal (1.6 km) and local mains (19.9 km) including house connections (1,545 No.) in NTLZ network
üNTHZ Network: Supply and laying of principal (0.3 km) and local mains (10.1 km) including house connections (555 No.) in NTHZ network
– OMRAN performed the topographical survey and hydraulic calculations and designed the water supply network with 2 km principal mains and 30 km local mains serving 2000 households.
– OMRAN performed trench excavation for 32 km of principal and main pipes, serving 1,400 households. It included excavation, bedding, compaction and backfill.
– OMRAN performed concrete works to include building chambers and service connections. Concrete works included the supply of materials, mixing of concrete, formwork, reinforcement, placing, compaction and curing of concrete and Site clearance after completion of WORKS.
– OMRAN laid over 2 km principal main and 30 km local mains for the water supply and distribution of the project.
– OMRAN executed all the mechanical and electrical works of the water supply and distribution under this contract.
– Project Technical Description: HDPE Pipe Different Sizes: OD 25, OD 32, OD63,OD90, OD110,OD180, OD225, OD280, OD355, OD450)
– Diameter up to: 450 mm
– Pipe Connection type: Butt Welding Connection 180 to 450
– Electro Fusion Coupling: 25 to 180

Project Gallery

Project Description

KfW awarded OMRAN the contract to design and build Faizabad Water Supply and Distribution Network that included water supply system, water distribution mains, chambers, valves, joints, bends, air valves, wash outs, valves and hydrants, standpipes, house connection and other equipment and elements. The Water Supply Distribution system was implemented in NTLZ and NTHZ zones.
üNTLZ Network: Supply and laying of principal (1.6 km) and local mains (19.9 km) including house connections (1,545 No.) in NTLZ network
üNTHZ Network: Supply and laying of principal (0.3 km) and local mains (10.1 km) including house connections (555 No.) in NTHZ network
– OMRAN performed the topographical survey and hydraulic calculations and designed the water supply network with 2 km principal mains and 30 km local mains serving 2000 households.
– OMRAN performed trench excavation for 32 km of principal and main pipes, serving 1,400 households. It included excavation, bedding, compaction and backfill.
– OMRAN performed concrete works to include building chambers and service connections. Concrete works included the supply of materials, mixing of concrete, formwork, reinforcement, placing, compaction and curing of concrete and Site clearance after completion of WORKS.
– OMRAN laid over 2 km principal main and 30 km local mains for the water supply and distribution of the project.
– OMRAN executed all the mechanical and electrical works of the water supply and distribution under this contract.
– Project Technical Description: HDPE Pipe Different Sizes: OD 25, OD 32, OD63,OD90, OD110,OD180, OD225, OD280, OD355, OD450)
– Diameter up to: 450 mm
– Pipe Connection type: Butt Welding Connection 180 to 450
– Electro Fusion Coupling: 25 to 180