Projects

Salang Tunnel Improvements, Salang Pass, Parwan

Client:
USACE
Co Number:
W5J9JE-12-C-0155
Awarded Year:
2012
Final Value:
US$13,046,181.27
Substantial completion Date
2-Jun-14
Service Category
Infrastructure

Project Description

This was a design built contract and contractor performed all Design, Engineering, procurement, Build and Construction management. the follwing activities performed during design and construction period of this project.
Site Survey / Master Planning/A-E Design;
Geotechnical Laboratory Testing;
As-Built DrawingsDesign Build Facilities:
Tunnel Ventilation
Power Plant
Government Field Office
North Approach Pavement Km # 1
South Approach Pavement Km # 1
South Approach Pavement Km # 2
Centerline Sub drainage System
Site Development & Improvements:
Mob/Demobilization
UXO Removal
Tunnel Pavement Demolition
Tunnel Temporary Road Surface
Tunnel Sub drainage System
Tunnel Drainage Layer
Tunnel Bituminous Base Course and Hot-Mix
Asphalt Surface
Rumble Strip
Upgrade and Improvements:
Ventilation Upgrades to Generator Building
1.5 MVA Generator #1
1.5 mVA Generator #2
LED Tunnel Lighting
Closed Circuit Television (CCTV) System
Transformer Replacement
Replace Existing Fixtures With LED Lighting

Project Gallery

Project Description

This was a design built contract and contractor performed all Design, Engineering, procurement, Build and Construction management. the follwing activities performed during design and construction period of this project.
Site Survey / Master Planning/A-E Design;
Geotechnical Laboratory Testing;
As-Built DrawingsDesign Build Facilities:
Tunnel Ventilation
Power Plant
Government Field Office
North Approach Pavement Km # 1
South Approach Pavement Km # 1
South Approach Pavement Km # 2
Centerline Sub drainage System
Site Development & Improvements:
Mob/Demobilization
UXO Removal
Tunnel Pavement Demolition
Tunnel Temporary Road Surface
Tunnel Sub drainage System
Tunnel Drainage Layer
Tunnel Bituminous Base Course and Hot-Mix
Asphalt Surface
Rumble Strip
Upgrade and Improvements:
Ventilation Upgrades to Generator Building
1.5 MVA Generator #1
1.5 mVA Generator #2
LED Tunnel Lighting
Closed Circuit Television (CCTV) System
Transformer Replacement
Replace Existing Fixtures With LED Lighting