Design and construct a new medium voltage feeder and duct bank from the Matbea switch to the Wazir-akbar-kahn switch, tie to the JL15 medium voltage feeder, install 3 pad mounted sectionalizer switches, voltage conditioner, and transient voltage surge suppressors for NMH.