This project consists of design and construction of a new DFAC, three additional Guard Towers, and modifications to existing buildings, replacement and additions to Concrete Perimeter Walls with ECP control facilities. All existing utility facility infrastructure will be replaced or upgraded, including MV electrical source, sewer collection system, water well and elevated storage with distribution system. Extensive demolition of existing facilities, are to be coordinated with new construction.