The project consists of the specified site grading, design for facilities, site and infrastructure, and installing two new wastewater treatment packages for ANA Darulaman Garrison in Kabul Province, Afghanistan.There are two (2) Solution Idea Model HydroXLNT SPEA-302-FESHT consisting of two treatment units (Trains A & B) for the purpose of treating the domestic wastewater. Capacity for each package is 100000 gpd. Each new treatment unit has a flow equalization tank, aeration tanks, clarifiers, sludge holding tank and Chlorination tank. The packages are designed for above ground installation on a concrete slab